WW Shipper

A publication about how containerised freight works, from the quay to the rail head.

Every page

All thirteen pages, and the four sections they sit in

A register is the right shape for this page and the wrong shape for the front one.

Thirteen pages
PageSection
Everything that had to change around the box
Malcom McLean's Ideal X sailed from Newark in April 1956, and the interesting part is the decade of cranes, yards and contracts that followed.
Everything that had to change around the box
Why the standard was the hard part
Corner castings and dimensions had to be agreed internationally before a box loaded in one country could be lifted in another.
Everything that had to change around the box
TEU is a unit of account, not a box
Capacity is counted in twenty-foot equivalents, which is why the figures rarely match the boxes you can see.
Everything that had to change around the box
The crane that had to be invented
Ship-to-shore gantries did not exist and had to be designed around the box, the ship's beam and the quay's bearing capacity.
The crane that had to be invented
Elizabeth, and the piers that emptied
Container terminals needed deep water and enormous flat land, which is why the traffic left the old finger piers.
The crane that had to be invented
The yard, seen from height
A terminal is a storage problem: every box must be reachable in a known number of moves.
The crane that had to be invented
Twistlock, lashing rod, and the hand that fits them
Securing a stack at sea is still manual work done at height in weather.
The crane that had to be invented
The same box, lifted without being opened
Intermodal is the whole point of the standard, and it is where most of the cost and most of the delay actually sit.
The same box, without opening it
Drayage, and the last thirty miles
The road leg between terminal and warehouse is short, expensive and the usual bottleneck.
The same box, without opening it
The bill of lading, which is older than any of it
A document that is simultaneously a receipt, a contract and a title to the goods — and the reason a container can be sold while at sea.
The same box, without opening it
Panama's 2016 locks, and the ships that no longer fit
The expansion redefined the size classes, and the ships built for the old locks became a category of their own.
The water ran out before the shipyards did
Suez, and the depth that decides everything
Canal draught limits do more to shape ship design than any shipyard's ambition.
The water ran out before the shipyards did
The water ran out before the shipyards did
Ships passed twenty thousand TEU and the constraint moved to berths, cranes and channel depth rather than to construction.
The water ran out before the shipyards did